Alton Towers SW8 Construction Update - 25th May 2017

Please login in order to report media.

  • Uploaded 10 months ago in the category Travel Bloggers

    Join us as we follow the construction of the new wooden roller coaster, set to open at Alton Towers in spring 2018.

    Manufactured by Great Coasters International, the ride will be located on the site of the old log flume, a ride that was demolished during late 2016.

    In today's video we share more updates than ever before from the construction site of SW8.

    As GCI start to work on the station we take a close look at the structure going into place.

    We also capture a delivery of framework to the site along with experiencing the Sky Ride for an aerial view of the construction.

    We look forward to sharing this exciting build with regular updates here on Theme Park Worldwide.



    Thank You For Watching Theme Park Worldwide ©
    Facebook Page: https://www.facebook.com/themeparkworldwide
    Twitter: https://twitter.com/#!/ThemeParkWW

  • altontowerssw8constructionupdate25thmay2017